Crookston Sports Center
/The three-sheet ice rink was designed in 2008, with construction being completed in 2009. The new area utilizes waste heat off the ice refrigeration system to provide most of the heat required for the facility. The total mechanical construction budget was 2.5 million.
Crookston, Minnesota